Step 1
How to use: Step 1 Surface preparation. New plaster – let the plaster dry completely for at least 1 month, or until its moisture content is below 14%. Old plaster – scrub off deteriorated old paint; areas with mould or moss must be scrubbed with Beger MouldWash B-3600, then washed clean and left to dry for 2-3 days. Caution: - Before every application, clean the surface so it is free of dust, cement residue, grease and other dirt, or sand off all dust first. - Repair cracks in the surface (narrower than 0.3 mm) with Beger Acrylic Filler #200 and sand smooth before painting

















