Step 1
Step 1 Surface preparation New surface: let it dry completely for at least 1 month, or until moisture content is below 14%. Old surface in good condition*: clean the surface so it is free of dust, cement residue, grease and all dirt. Old surface: scrape off all deteriorated old paint with a plastic brush - If the surface has mould and moss, remove it with Beger MouldFree M-001 mould and moss remover - If the surface has hairline cracks or cracks of 0.3-2 mm, fill with Beger Acrylic Filler F-200 - If the surface has cracks of 2-10 mm, fill with Beger Acrylic Sealant F-001 *Old surface in good condition means a surface that is not chalky, peeling or blistering

















