Step 1
Step 1 Surface preparation: New plaster: let the plaster dry completely for at least 1 month, with moisture content below 14%, and clean the surface so it is free of dust and dirt. Old plaster: for old plaster or previously painted surfaces, always repair problem areas first, scrub off deteriorated old paint, then wipe and wash the surface clean - For surfaces with peeling, blistering or chalking, strip off the old paint, then clean the surface - For surfaces with mould or moss, scrub and clean the surface, then apply 1 coat of Beger MouldFree M-001 mould and moss remover and leave it to dry for 1 day without rinsing - For surfaces with cracks no larger than 1 mm, fill them with Beger Acrylic Filler F-200 - For surfaces with cracks of 2 - 10 mm, fill them with Beger Acrylic Sealant F-001

















